A register of every damper in the building, with the result of each test. Download it, fill in what you know, and hand it to whoever tests next.

Get a quote
Ductwork and vent pipes

Why keep a damper register

A test report tells you what happened on one day. A register tells you what you own: how many dampers there are, where they are, which ones have never been reached and which failures are still open. Fire risk assessors ask for it, insurers ask for it, and it makes every quote more accurate because the firm knows the count before it arrives.

The law asks you to keep fire safety equipment in good repair under a suitable system of maintenance (Fire Safety Order, article 17). A register with dates and results is the simplest way to show that system exists.

The columns and what they are for

ColumnWhy it is there
Damper ID or asset tagThe number on the label fixed next to the damper. Every other record hangs off it.
Building, floor, room and riserEnough for a stranger to find the damper again without drawings.
Type and sizeSpring, motorised fire and smoke, or intumescent, because each is tested differently.
Access panel and where it isThe column that explains most no-access results.
Date tested and who tested itName and company, so the record is traceable.
ResultPass, fail or no access. Never blank.
Photo referencesOne photo open and one closed, matched to the report.
Defect, remedial action and date closedShows a failure was followed through, which is what an assessor or inspector looks for.
Next test dueUsually twelve months on, sooner in dirty ductwork.

Filling it in for the first time

Start with whatever drawings you have and give each damper a provisional number. Mark the ones you know have an access panel. Leave the rest blank: the first test visit will find the missing dampers, add tags and fill in the gaps. After that, update the results after every visit and close each defect line when the repair is retested.

Hospitals and other health buildings using a sampling cycle should add a column for the year each damper is due in the cycle, as described in the IHEEM guidance.

Where the log fits with the test report

The firm that tests your dampers will give you its own report. Copy the results into the register rather than replacing it, so you keep one list that survives a change of contractor. The inspection page sets out what that report should contain, and the regulations page explains who must keep the records.

Need the register filled in properly? A first-time survey is the usual starting point. Our cost guide explains how that is priced.

Tell us where the dampers are

Give us the building postcode and who to speak to. A damper count, a recent report or a ceiling plan all help the firm price it, but none of that is needed to start.

We look for a damper testing firm that works in your area and let you know which one before anything else happens. Your details reach that firm only once you agree, and there is no charge to you.

Your building and contact details
Get a quote